JOTAIN MATERIALS | SHAFT MATERIAL SELECTION WORKSHEET Revision: 7 September 2026 Companion article: https://jotainmaterials.com/technical-resources/40cr-vs-ck45-shaft-material/ Complete this worksheet with the approved drawing and process requirements. Blank fields are questions to resolve, not supplier acceptance or design approval. 1. PART AND REQUIRED MATERIAL Part / order line: Drawing number / revision / date: Quantity: Required grade / product standard / edition: If the drawing says CK45, confirmed designation and standard: Customer or project specification: Document precedence / responsible engineer: 2. DUTY AND CRITICAL FEATURES Steady / reversing torque and bending requirements: Shock, temperature, corrosion or other service conditions: Shoulders, fillets, keyways, splines, holes, threads and fits: Specified fatigue or toughness requirements / reference: Critical surface and geometry requirements / drawing zones: 3. DIMENSIONS AND PROCESS Supplied diameter / limits / units: Supplied length / limits / units: Rough-machined dimensions: Section during heat treatment: Finished dimensions / drawing reference: Machining allowance (identify radial or diametral): End allowance / test material required: Thermal delivery condition: Surface process at delivery: Later treatment, machining, grinding or coating / responsible party: Straightness method / supports / assessed length / limit / stage: 4. REQUIRED PROPERTIES AND TESTS Property / method / acceptance value / units: Specimen source / radial and axial location / orientation: Material condition represented / heat or treatment lot: Impact method / specimen / temperature / acceptance, if required: Hardness method / locations / acceptance, if required: UT or MT method / coverage / stage / acceptance, if required: Inspection-document standard / edition / type: Required reports / submission date / reviewer: 5. SUPPLIER ALTERNATIVE (COMPLETE SEPARATELY FROM REQUIRED ROUTE) Proposed grade / standard / edition: Chemistry differences: Product scope, condition and section-property differences: Sampling, dimensions, surface and inspection differences: Price and lead-time effect: Drawing or customer approval needed: Written decision / approver / reference / date: 6. OPEN ITEMS BEFORE ORDER Item / affected requirement / responsible party / due date: Supplier response / document reference: Final approved route / revision / date: Prepared by: Reviewed by: Drawing and supporting files attached: