03 / How · Interactive route worksheet
Configure the order route.
Choose the condition, surface, inspection, and packing requirements to review, then follow the same bar through the integrated route. Selections remain buyer inputs until the performing facility and sequence are confirmed.
Buyer diligence path
From homepage promise to order evidence.
Now: Order route.Follow the same route from responsibility and process definition to documented release and RFQ.
Buyer route worksheet
Configure your production route
Build an RFQ-ready route by selecting the heat-treatment condition, surface processing, inspection scope, and packing approach you want JOTAIN to review.
Integrated production route · 14 stages
The life of one round bar.
Follow one representative bar through order-specific upstream supply, JOTAIN-owned downstream processing, inspection, and export preparation.
The worksheet records the requested condition; the animation is a reference to possible stages, not a mandatory sequence. Annealing, normalizing, or quenching and tempering applies only when selected and confirmed for the accepted route.
Preparing the integrated production route…
- 01Alloy billet
- 02Reheat
- 03Hot roll
- 04Cooling bed
- 05Anneal
- 06Normalize
- 07Quench
- 08Temper
- 09Straighten
- 10Peel
- 11Centerless grind
- 12Inspect and trace
- 13Mark and protect
- 14Export pack
Representative full-route visualization. Mill, facility, grade, sequence, inspection, records, and packing are confirmed for each accepted order.
Shanghai Export Hub
Production does not end at the factory gate.
The Shanghai hub supports storage, long-bar handling, final packing review, export staging, customs execution, and container or breakbulk coordination.
The responsible entity, exact location, availability, handling plan, and applicability of these hub capabilities are confirmed during qualification or order review.
- 15,000 m² export warehousing
- 350 m quay
- 40 t heavy-lifting capability
Capability summaries describe the manufacturing and control network. The applicable legal entity, material origin, facility, process route, inspection plan, documents, and acceptance basis remain order specific.
Carry the selected route forward
Next: verify the route or send it for review.
Open route selections remain valid and will be confirmed during RFQ.

