Technical guides · Processing

Specify the finished bar and the processing sequence together.

QT, peeled, ground, machined, threaded, coated and chrome-plated each describe only part of the work. Specify the starting condition, facility, sequence, machining allowance and finished requirements. Agree inspection points, how identification is carried between operations, any subcontracted work and the records required before release.

A process description is not proof that every facility, size, sequence, tolerance, or inspection scope is available. The applicable route and performing party are confirmed for the order.

Guides
12
Items to specify
04
Format
HTML

What to include in your enquiry.

Check the details in this table, then use the guides below for more information.

Decision areaDefine in the inquiryWhy it matters
Incoming stateProduct form, grade, section, condition and starting surfaceFix the baseline before processing
SequenceHeat treatment, straightening, peeling, machining, grinding, threading and coating orderControl interactions between operations
Finished stateDiameter, tolerance, straightness, roughness, allowance and protectionDefine what is delivered
Process evidenceFacility, lot identity, records, inspection point and release authorityKeep the route traceable

Processing guides

Find the guide for your material, process or inspection question.

Find the product or send your requirements.

Send the specifications you have agreed.

Send the grade or approved alternative, standard, dimensions, condition, processing, inspection, documents, quantity, destination, and drawings for review.

Open the RFQ worksheet